B. SMARTBLOCKPLUS TRIANGLE
Throughout the installation process, it is important to keep in mind three key elements of the SmartBlockPlus building system and how they relate to each and every procedure you execute.
- Alignment
From aligning the stud markings on the outside of the forms as you stack them, the cuts you make in fitting the walls together, keeping things level as you progress, and plumbing the walls with your alignment system, keeping things in alignment both horizontally and vertically is critical to your overall success.
- Reinforcement
Reinforcing the cuts made in the forms is as important as the proper selection, spacing, and placement of reinforcing steel in your SmartBlockPlus walls, with particular emphasis on openings and lintels.
- Concrete
Proper design strength, slump, placement and consolidation of the concrete you use will ensure that all of your efforts result in the superior structural performance of your SmartBlockPlus project.
|
|
|
International Patent - Copyright 2007 Ceramiche Bernini s.r.l.General Manager: Michele
Caboni - mobile: (+39) 349 4263120
Office Import/Export Via Fabbri, 28 - 09170 Oristano (OR) - Sardinia - Italy
Ceramiche Bernini s.r.l. - ceramichebernini@yahoo.it
- info@smartblockplus.com - Tel./Fax:
(+39) 0783 251010
Partita IVA: 00682520952
Exclusive distributor for the countries:
Europa, Russia, Africa, Balcani (Albania, Bosnia Erzegovina, Croazia, Ex Republica
Jugoslava,
Macedonia, Serbia, Montenegro, India, Pakistan, Middle East - Uninited Emirates
excluded)
|
|